Regulatory Handbook

Regulatory Handbook

The Regulatory Handbook contains information about local, state and federal permits, approvals, and licenses for Washington State. Although not a complete list, this list does provide in-depth information on most environmental permits (please see the Regulatory Handbook disclaimer).

The Regulatory Handbook also contains performance data on timeliness for specific permits per Chapter 43.42A. This permit timeliness performance data is also accessible in ORIA's Central Repository on data.wa.gov.


Don't know what permits you'll need?

  • Complete ORIA's Project Questionnaire, it can help identify what permits, approvals, and licenses you may need based on an interview process.
  • Visit ORIA's Publications, several publications reference permits needed for specific projects, such as building docks or piers.
  • You can also contact ORIA at 1-800-917-0043 or help@oria.wa.gov if you don't know what permits are needed or are looking for a specific permit.

Regulations

Top
Agent's License under Commission Merchant Act (Agricultural Products)

Individuals and businesses who are authorized to receive, contract for, or solicit or negotiate the consignment or purchases of agricultural products on behalf of a licensed commission merchant, dealer, broker, or cash buyer.


Commission Merchant's License (Agricultural Products)

Individuals and businesses who receive on consignment, take possession or control of, or act as brokers in the resale or processing of unprocessed agricultural products.


Fruit and Vegetable Shipping Permit (F&V Shipping Permit)

A shipping permit can be issued in lieu of a certificate of compliance. No person may ship, transport, accept for shipment or accept delivery of any commercial lot of apples, apricots, asparagus, Italian prunes, peaches, pears, and sweet cherries for which a certificate of compliance or shipping permit has not been issued. A shipping permit is required for shipping apples, apricots, asparagus, Italian prunes, peaches, pears, and sweet cherries to a processing plant outside the State of Washington. Apples, apricots, asparagus, Italian prunes, peaches, pears and sweet cherries being shipped to processors within Washington State do not require a shipping permit. Fruits or vegetables covered by a certificate of compliance do not require a shipping permit.


Marijuana Infused Edibles Processor (MIE Processor)

The MIE Processor specialty license with the WSDA Food Safety Program is required when a firm wants to produce and sell wholesale edible products that contain cannabis (marijuana, hemp) ingredients.


Nursery Dealer's License (Retail or Wholesale)

A nursery retailer/wholesaler license is required for businesses that:

  • Sell or hold live plants or turf for planting, breeding, or decoration.
  • Perform landscaping and lawn maintenance which provides planting or installing new plants or turf.

Seed Labeling Permit

A person labeling seed for distribution for sale in this state.

Top
Air Operating Permit

Commercial and industrial businesses that emit large amounts of air pollution are required to get an air operating permit. This includes:

  • More than 100 tons per year of any pollutant.
  • More than 10 tons per year of any hazardous air pollutant
  • More than 25 tons per year of a combination of hazardous air pollutants…

Air Quality Minor Source Registration Program (Air Quality Registration Program)

A source which is listed under the source classification list in Washington Administrative Code (WAC) 173-400-100 and operates in Washington State.


Air Quality Notice of Construction (NOC) Permit

An NOC permit is required to install a new source of air pollution or modify an existing source of air pollution (either an increase or decrease in emissions). A NOC Application is also required to install, replace, or a change to the air pollution control equipment installed on an existing source of air pollution, unless the source or activity is exempt. To determine if your project is exempt, contact the permitting authority for your area. Be prepared to provide a detailed description of your project.


Asbestos - Air Quality (Demolition / Renovation Notification Form)

You must submit an asbestos demolition/renovation notification form any time you want to:

  1. Demolish any structure, including for the purpose of fire training.
  2. Remove or abate Regulated Asbestos Containing Material (RACM) in an existing structure.

Asphalt Plants (General Order)

Any portable or stationary asphalt drum mix plant, proposing to operate in the following counties:

  • Adams
  • Asotin
  • Chelan…

Auto Body Shops (General Order)

Any auto body shop proposing to operate in the following counties:

  • Adams
  • Asotin
  • Chelan…

Burn Permit (Silvicultural Burning)

A permit is required when you plan to burn piled forest material.


Burn Permit - Agricultural Bale

Only commercial agricultural operations can apply for this permit to burn baled agricultural residue. The agricultural burning regulation (Chapter 173-430 WAC) defines a commercial agricultural operation as a farmer who is practicing agriculture for commercial purposes and has filed an IRS schedule F form or its corporate equivalent All commercial agricultural operations must get a permit before burning natural vegetation. Baled residue permits are used to burn bales that are:…


Burn Permit - Agricultural Field

A permit is required to burn:

  • Post-harvest field and crop residue
  • Cereal grain stubble
  • Flaming for weed control in organic farming…

Burn Permit - Agricultural Pile

If you are a commercial farmer and you are piling up agricultural vegetation to burn on land that is going to stay in agriculture, you must get a Pile Burn permit from Ecology. You may also use this application if you have a documented pest emergency. If you are a commercial farmer, you do not need a permit from Ecology for the following types of agricultural burning:

  • Annual orchard prunings…

Burn Permit - Agricultural Spot Burn

A permit is required if you are burning in areas that are 1/2 acre or less in size, such as:

  • Small weed patches.
  • Spots of heavy residue.
  • Equipment plugs and dumps…

Burn Permit - Fire Training

This fire training burn permit is only for structural fire training. For other types of fire training, contact Ecology. A permit is required for all structural training fires located within urban growth areas (http://www.ofm.wa.gov/pop/smallarea/maps/uninc_uga/) or in cities with 10,000+ people (http://www.ofm.wa.gov/pop/popden/default.asp). Whenever a building is going to be demolished, renovated, or burned for fire training purposes, the building must be inspected by a certified Asbestos Hazard Emergency Response Act (AHERA) building inspector. Samples from the testing must be sent to a lab certified to test for asbestos. The building owner or fire department must send an Asbestos Demolition/Renovation Notification Form to the agency that…


Burn Permit - Flood and Storm Debris

This permit is required to burn storm and flood debris resulting from a declared emergency and upon agreement with local fire jurisdictions. Storm and flood debris is natural vegetation such as leaves and branches that is left behind by storms and/or floods. Material is considered storm or flood debris if:

  • The storm or flood occurred in the last two years, and
  • The city, county, or state government declared an emergency as a result of the storm or flood…

Burn Permit - Land Clearing

To be eligible for a land-clearing permit, the use of the land must be changing. Common changes in use are:

  • Non-agricultural to agricultural;
  • Vacant to residential development; and
  • Vacant to commercial development…

Burn Permit - Special

This permit is for situations where burning does not fit into the categories of agricultural, residential, or land clearing. A special burn permit is required to burn vegetation in areas larger than 4 x 4 x 3 feet, or that does not qualify as either:

  • Agricultural burning — burning of orchard trees, open fields, harvest debris.
  • Land clearing — burning of trees, stumps, shrubs, other natural vegetation from land clearing…

Concrete Batch Plants (General Order)

Any portable or stationary asphalt drum mix plant, proposing to operate in the following counties:

  • Adams
  • Asotin
  • Chelan…

Dairy Manure Anaerobic Digesters (General Order)

Any dairy manure anaerobic digester proposing to operate in the following counties:

  • Adams
  • Asotin
  • Chelan…

Dry Cleaners (General Order)

Any dry cleaner, using less than 2,100 gallons per year of Perchloroethylene proposing to operate in the following counties:

  • Adams
  • Asotin
  • Chelan…

General Order of Approval for Gas Fired Emergency Electrical Generators

Using a Rich-Burn, Spark Ignition, Gaseous Fossil Fuel Powered Emergency Generator in the counties or facilities that are regulated by Ecology. Your engine must meet the General Order conditions determined by Ecology.


Prevention of Significant Deterioration (PSD) Air Quality Permit

A facility with a new major source of air pollution with the potential to emit a pollutant regulated under the Federal Clean Air Act at 100 tons/year for 28 specific emission source types, or 250 tons/year or more for all other emission source types. A modification of an existing major source of air pollution that increases emissions of a pollutant regulated under the Federal Clean Air Act at or above PSD Significant Emission Rates (SER). If you are not sure if your activity requires this permit you can request a PSD program applicability review. An applicability determination has a $500 fee.


Radioactive Air Emission License to Operate New Facility (or Modification of an Existing Source (New Construction or Abatement)

Any activity that emits, or has the potential to emit, radionuclides into the air.


Radioactive Air Emissions Facility Approval to Construct

Any activity that emits, or has the potential to emit, radionuclides into the air.


Small Water and Steam-Generating Boiler (General Order)

Any facility proposing to use a small water heater and steam-generating boiler in the following counties:

  • Adams
  • Asotin
  • Chelan…

Stationary or Portable Rock Crushers (General Order)

Any portable or stationary rock crusher plant, proposing to operate in the following counties:

  • Adams
  • Asotin
  • Chelan…
Top
Aquatic Farm Registration

Culturing or transferring food fish, shellfish, and certain aquatic animals.


Aquatic Lands Right of Entry License

Activities that the Department of Natural Resources (DNR) commonly authorizes under this license are for recreational, scientific, or environmental purposes. The activity cannot interfere with the use and enjoyment of the state-owned aquatic lands by others.


Aquatic Use Authorization (Aquatic Lands Lease)

Most activities taking place on state-owned aquatic lands may require a lease. Contact your District Land Manager to determine if your proposal requires other forms of authorization.


Export Certificate (For Commercially Licensed Shellfish Operations)

An export certificate is a document issued to commercially licensed shellfish operations that ship product (clams, mussels, oysters, geoducks) to Asian countries.


Fish Habitat Enhancement Projects

The applicant must meet the specified requirements stated on the permit application form.


Fish Stocking Application Permit (FinFish)


Fish Transport Application Permit (FinFish)


Fish Transport Permit

An approved Fish Transport Permit from the Washington Department of Fish and Wildlife (WDFW) is required to transport fish into and through Washington State.


Habitat Recovery Pilot Program (HRPP)

Any restoration activity for the benefit of fish or their habitats, that will use, divert, obstruct or change the natural flow or bed of any of the salt or fresh waters of the state.


Harvest Site Certificate

This certificate is required for each parcel being harvested by a licensed shellfish operation. It must be ready to display whenever you are in possession of commercial quantities of molluscan shellfish (clams, oysters, mussels, scallops) that you intend to sell for human consumption. DOH continually evaluates commercial shellfish growing areas and certified harvest sites to protect the public since shellfish can carry chemicals, bacteria, viruses, and marine biotoxins.


Hydraulic Project Approval (HPA)

Work that uses, diverts, obstructs, or changes the natural flow or bed of any of the salt or fresh waters of state. Includes bed reconfiguration, all construction or other work waterward, under and over the ordinary high water line, including dry channels, and may include projects landward of the ordinary high water line (e.g., activities outside the ordinary high water line that will directly impact fish life and habitat, falling trees into streams or lakes, bridge maintenance, dike construction, etc.)


Scientific Collection Permit (SCPS)

Any trapping, netting, catch and release and handling with the exception of transitory holding of reptiles, amphibians, or invertebrates for identification, and marking or tagging; collecting lethally or non-lethally; and salvage and possession of carcasses or parts with the exception of shed antlers.


Shellfish Import Application Permit (Shellfish - Import Permit)


Shellfish Operation License

Commercially harvesting and/or processing and shipping molluscan shellfish (clams, oysters, mussels, scallops).


Shellfish Transfer Application Permit (Shellfish)


Water Recreation Facility Operating Permit (Pool Permit)

Initial application for newly proposed facilities. Renewal application when annual or seasonal expire.


Water Type Modification

A WTMF is not required. It is a tool that can be used to make water type changes based on field verification. Prior to submittal of a forest practices application/notification, forest landowners are required to determine, in the field, the type of any regulated waters as identified in the forest practices rules (WAC 222) within proposed harvest boundaries, including the area within 200 feet of the proposal. In addition, field verified stream typing is required prior to placement or replacement of stream crossing structures for road construction or road maintenance.

Top
21-02 Compliance

Capital projects using funds appropriated in the State's biennial Capital Budget.


Archaeological Site Alteration and Excavation Permit

Excavating, altering, defacing, or removing archaeological objects, resources or artifacts from archaeological sites or Native Indian graves, cairns or glyptic records, or non-Indian historic archaeological resources.


Section 106 Review

The application for federal funding, including funding passed through a state or local agency, a federal permit, license of use of federal lands.

Top
Community Solar Company Registration (Community Solar)

Any person, firm, or corporation --other than an electric utility or community solar cooperative -- that owns a solar energy system with a direct current nameplate generating capacity equal to or below one thousand kilowatts (MW) provided to a customer through a lease, power purchase agreement, loan or other financial agreement with the community solar company in order to obtain a beneficial interest in, other than direct ownership of, the solar energy system. Reference RCW 80.28.370

Top
Coastal Zone Management (CZM) Federal Consistency

Federal agency activities and developments and projects requiring a federal license or permit, and which are proposed within any of Washington's 15 coastal counties. The coastal counties are the 15 counties from Whatcom south to Wahkiakum that border the Puget Sound or Pacific Ocean. (see notes/comments below)


Discharge of Dredge or Fill Material Into Water (Department of the Army Permit (Section 404)

If you plan to conduct ground-disturbing activities in waters of the United States, including wetlands, you may need authorization from the U.S. Army Corps of Engineers (Corps). A variety of activities typically require Department of the Army authorization when they occur in waters of the United States. They include, but are not limited to, placement of fill material, grading, mechanized land clearing, and redeposit of excavated/dredged material. The Corps authorizes activities by issuing individual and general permits. Under Section 404, individual permits include Standard Individual Permits, and general permits include Nationwide Permits and Regional General Permits. The Corps determines which type of permit is needed. A Department of the Army permit can include…


Federal Energy Regulatory Commission (FERC) License or Exemption

Construction and operation of non-federal hydropower projects may need a license or exemption. See FERC regulations at 18 CFR Parts 4 and 5. Unless a project has a valid pre-1920 federal permit, non-federal hydroelectric projects are subject to the Commission's jurisdiction if the project:

  • Is located on navigable waters of the United States;
  • Occupies public lands or reservations of the United States…

National Environmental Policy Act (NEPA)

NEPA applies to all major federal actions: federal projects or any project requiring a federal permit, receiving federal funding, or located on federal land. The list of NEPA categorical exclusions is determined in rules specific to each federal agency.


Private Aids to Navigation (PATON) (Non-Bridge Projects)

Installation of a fixed structure or floating object within the waters of the United States.


Section 401 Water Quality Certification

You must request a Section 401 Certification to conduct any activity that might result in any discharge into waters or non-isolated wetlands or excavation in water or non-isolated wetlands (including dredge or fill material) into waters of the United States. Categories of 401 Water Quality certifications FERC hydropower re-licenses: Ecology works with the Federal Energy Regulatory Commission (FERC) to re-license existing dams or license new construction for hydropower dams. When an applicant requests a certification for a hydropower license, Ecology works with the utility or project proponent and review the applicable studies, analyses, and plans. If Ecology determines that water quality standards are attainable, a 401 certification is issued with appropriate…


U.S. Coast Guard Bridge Permit

Construction or modification of bridges over navigable waters. "Navigable" waters is a legal determination that is not contingent on the waterway actually being navigated. Contact the Coast Guard Bridge Program to determine if a waterway is "navigable" and if the project will require a bridge permit. No other agency has the authority or expertise to make this determination.


Work in Navigable Waters (Department of the Army (Section 10)

If you plan to conduct work in, over, or under navigable waters of the United States you must apply for authorization from the U.S. Army Corps of Engineers (Corps). The Corps authorizes activities by issuing individual and general permits. Individual permits include Standard Individual Permits and Letters of Permission, and general permits include Nationwide Permits and Regional General Permits. The Corps determines which type of permit is needed. A Department of the Army permit can include authorization under Section 10 and/or Section 404. If you have questions about the Corps permit process, contact the Corps project manager assigned to the county where the work is proposed.

Top
Cottage Food Operation Permit

Activities including the making of baked goods, some fried foods, standardized jams, jellies, preserves & fruit butters, stovetop or microwave candies that are not potentially hazardous, vinegars, and dry mixes.


Egg Handler/Dealer License

Producing, handling, contracting for, obtaining possession, controlling, or processing eggs for sale. EXCEPTION: The exception to the Egg Handler/Dealer License being required would be a producer only selling their eggs directly to the consumer at the production location.


Export Sanitary Certificate (For Transporting Processed Foods)

Transporting processed foods into domestic and international markets.


Food Processing Plant License

Facilities that handle or process any food in any manner for sale or distribution and consumption by another party. A full list of processes and exceptions is listed at https://agr.wa.gov/departments/food-safety/food-safety/food-processors.


Organic Food Handler and Processor Certification

Handling and processing facilities that are selling, labeling, or representing products as "organic."


Organic Producer Certification: Crop and/or Livestock

Selling, labeling, or representing crop or livestock products as "organic."


Tribal Bait Harvest Site Certificate and Bait Harvest Permit

Top
Boiler/Pressure Vessel Installation or Reinstallation Permit

Installation or reinstallation of any new or existing boiler and/or unfired pressure vessel in the state of Washington.


Commercial Weighing and Measuring Device Registration

Any business using a weighing or measuring device for commercial purposes is required to register the device(s) annually.


Construction Elevator Installation (Hoist) Permit

Installation of a temporary elevator used for construction or demolition on job sites.


Crematory

Cremating human remains in Washington.


Electrical Class B Permit

For Class B eligible work- see WAC 296-46B-908(10). This is a less expensive alternative permit, but may only be used by licensed electrical contractors for work that is specifically allowed as Class B eligible.


Electrical Work Permit

Any electrical installation or alteration described in RCW 19.28.101 and WAC 296-46B-901.


Elevator Installation Permit (New, Renewal, and Alterations)

All new installations, renewals and alterations


Elevator Installation Variance Permit

Property owners or elevator companies may apply for a variance for items that are allowable deviation(s) from specific requirements of the Washington Administrative Code (WAC) 296-96 and other codes adopted by the elevator department where the proposed alternative method(s) maintain equivalent safety.


Equine Certificate Of Veterinary Inspection and Interstate Movement Permit (EXPIRED: SEE NOTES/COMMENTS FOR DETAILS)


Equine Semen/Embryo Import Permit

Persons who want to obtain semen or embryos from out of the state to artificially inseminate their mares.


Factory Assembled Structure Permit

Alterations to Factory Assembled Structures for: Commercial Coaches, Factory Built Temporary Worker Housing Structures, Manufactured / Mobile Homes, Recreational Park Trailers, Recreational Vehicles, and Vendor / Medical Units


Feeding and Grazing Permit (Pasture to Pasture)

Any person, business or entity that moves cattle in and out of Washington to an adjoining state to graze without obtaining a health certificate or certificate of veterinary inspection must obtain a Feeding and Grazing Permit.


Final Disposition of Reduced Human Remains

Scattering, burying or otherwise disposing of reduced human remains as a business; or as an individual who is not a direct family member (see RCW 68.50.160)


Household Goods Carrier Permit


Manufacturer of Gambling Equipment/Paraphernalia Special Sales Permit


Minor Work Permit


Permit for Nonprofit Organizations to Conduct Bingo at Agricultural Fair


Permit for Persons to Operate Bingo Games Only During and Upon the Site of Bona Fide Agr (Commercial Business)


Permit to Import

Any person, business or entity that wants to import animals or animal reproductive products that require an entry permit.


Permit to Operate Radio Signal System in Designated Area (Talkie-Tooter Permit)

Logging activities which operate any cable logging machines.


Plant Sale Permit

It allows nonprofit organizations, conservation districts, and clubs to conduct plant sales without obtaining a license. Educational Organizations are also allowed to obtain this permit but are not subject to the same limitations.


Private Non-Profit Bus Certificate


Rental Boiler Operating Permit

Operating rental boilers in the state of Washington


Reseller Permit

See purpose of permit.


Solid Waste Carrier Certificate


Special Poultry Permit

Activities include slaughter, preparation or sale of whole, raw poultry (1000 or fewer poultry per calendar year).


Special Sale Permit

Any individual, farmer's cooperative association, livestock market, association of livestock breeders, or youth livestock organizations such as 4-H, FFA, or other junior livestock group who desires to conduct a special sale must first obtain a permit.


State Environmental Policy Act (SEPA)

See the Determining if SEPA is required and Categorical Exemptions web pages. See the Links section below.


Tow Truck

Registered tow truck operators who engage in the impounding, transporting, or storage of unauthorized vehicles or the disposal of abandoned vehicles are required to have a valid permit for each tow truck

Top
Temporary Worker Housing License of Approval (TWH, Labor Camp, H-2A Housing)

A new facility that meets the definition for TWH 246-358, change of ownership, annual renewal.


Transient Accommodation License of Approval (TA)

New facility that meets the definition of a Transient Accommodations, Change of ownership of a TA, an annual renewal, and referral of an unlicensed facility.

Top
Exploration Reclamation Permit

Mineral exploration programs that disturb greater than 1 acre in 8 acres are required to obtain an exploration permit under the authority of RCW 78.44.


Forest Practices Approval/Notification - Eastern Washington, Class II


Forest Practices Approval/Notification - Eastern Washington, Class III


Forest Practices Approval/Notification - Eastern Washington, Class IV-General


Forest Practices Approval/Notification - Eastern Washington, Class IV-Special


Forest Practices Approval/Notification - Western Washington, Class II


Forest Practices Approval/Notification - Western Washington, Class III


Forest Practices Approval/Notification - Western Washington, Class IV-General


Forest Practices Approval/Notification - Western Washington, Class IV-Special


Forest Practices Permit

Forest Practices that may require a permit include: harvesting timber, salvaging standing and down wood, constructing forest roads, opening or expanding a rock pit on forest land for forestry use, operating in or over any typed water and applying forest chemicals with an aircraft.


Geothermal Drilling Permit

Drilling, redrilling or deepening of a geothermal well requires a permit, "Any person proposing to drill a well or redrill an abandoned well for geothermal resources shall file with the department a written application for a permit to commence such drilling or redrilling" RCW 78.60.070(1).


Oil and Gas Drilling Permit

All oil and gas drilling, re-drilling, deepening, or operations in the search and/or production of oil and gas in the state require an Oil and Gas Drilling Permit.


Surface Mining Reclamation Permit

Surface mining. A reclamation permit is required by DNR for any area or areas in close proximity to each other, as determined by the department, where extraction of minerals results in:
  1. More than three acres of disturbed area, or
  2. Surface mined slopes greater than 30 feet high and steeper than 1.0 foot horizontal to 1.0 foot vertical, or more than one acre of disturbed area…
Top
Building Permit

Construction of permanent buildings or additions to existing facilities.


Floodplain Development Permit

Any development (see definition below) within the 100-year floodplain. Development is defined as: any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials located within the area of special flood hazard.


Noise Ordinance

Local governments set maximum intruding sound level limits or adopt statewide statute.


Shoreline Conditional Use Permit

These are determined by the local government as specified in its SMP.


Shoreline Exemption

A proposal’s eligibility for an exemption from the SDP process is determined by the local government. Activities exempt from the requirement for a substantial development permit are in:


Shoreline Substantial Development Permit

An SDP is required for all non-exempt developments and uses exceeding $8,504 fair market value. RCW 90.58.030(3)(a) defines "development" as “a use consisting of the construction or exterior alteration of:

  • Structures;
  • Dredging; drilling; dumping; filling…

Shoreline Variance Permit

These are determined by the local government as specified in its SMP.


Solid Waste (Handling) Permit

Operation of a solid waste facility (landfill, transfer station, recycling facility, some composting operations, etc.)


Subdivision Approval

Local governments, through ordinances, have primary authority to regulate the dividing of land for residential or other purposes.

Top
Collective Experimental Pesticide Use Permit

This permit allows recognized research institutions, organizations, pesticide registrants, or persons licensed to conduct certain types of small-plot demonstrations and research activities on land they own or control to experiment with pesticides without having to obtain an individual permit for each experiment.


Commercial Applicator License

Applying pesticides to the lands/property of another requires the Commercial Applicator License. This is a joint company - person license. The person who makes the pesticide application decisions for the company must obtain the license.


Commercial Fertilizer Registration

No person may distribute in this state a commercial fertilizer until it has been registered with the Washington State Department of Agriculture (WSDA) by the producer, importer or packager of that product. An additional registration requirement for waste-derived and micronutrient fertilizers was added to the fertilizer law in 1998. Waste-derived and micronutrient fertilizers must go through a Department of Ecology review before being registered by WSDA.


Commercial Operator License

Applying pesticides to the land or property of another while employed by a Commercial Applicator company.


Experimental Pesticides Use Permit - Aquatic Sites

This permit is required for all experimental projects involving the application of pesticides that are not registered for use in aquatic environments, and for all experiments involving uses not allowed by the pesticide label.


Experimental Pesticides Use Permit - Terrestrial Sites

This permit is required for all experimental projects involving the application of pesticides on terrestrial sites that are not registered and for all experiments involving uses not allowed by the pesticide label.


Private Applicator License

Applying or supervising the use of restricted use pesticides on your own or your employer's property for the purpose of producing an agricultural commodity.


Private Commercial Applicator License

Application of restricted use pesticides to land, property, or materials owned or rented by applicator or applicator's employer for a purpose other than the production of an agricultural commodity.


Public Operator License

Applying restricted use pesticides by any means or any pesticide through power equipment as part of one's employment with a governmental agency. This license is not required of governmental research personnel unless applying restricted use pesticides.

Top
Amusement Ride or Structure Operating Permit

Any amusement ride as defined in RCW 67.42.010 and WAC 296-403A-100.


Banquet Permit

For events at a public place, but closed to the general public, where alcohol is given away free of charge.


Class 1 - Alcohol Permit

Required for staff in the medical field to prescribe and use alcohol for uses up to but not limited to prescribing to patients.


Class 10 - International Trade Show Permit (Trade Show Permit)

For specific trade shows held by a government entity that want to include alcohol. Call if unsure please.


Class 11 - Bed & Breakfast Permit (B&B Permit)

Supplying alcohol for guests at a lodging location considered a Bed and Breakfast facility.


Class 15 - Allowing students between 18-20 to taste but not consume alcohol

For any accredited culinary course dealing with alcohol that has students under 21, but at least 18 years of age tasting but not swallowing alcohol.


Class 16 - Spa/Salon Permit

Serving alcohol at a salon or spa


Class 17 - Nonprofit private wine auction permit

To auction wine at a private event to retailers and collectors


Class 18 (Special Permit for Wineries)

Winery events not open to the general public or advertised that take place away from the winery.


Class 19 (Special Permit for Distilleries)

Distillery events not open to the general public or advertised that take place away from the distillery.


Class 2 - Alcohol Permit

Manufacturing or mechanical businesses. Making your own tinctures, soaps and shampoos.


Class 20 - Permit for Breweries

Brewery events not open to the general public or advertised that take place away from the brewery.


Class 4 - Serve Employee & Guest

To allow alcohol on premises of businesses not licensed under RCW 66.24. Not all businesses qualify, must not be open to the public.


Class 5 - Alcohol Permit

Used to manufacture liquor and other food products containing alcohol.


Class 6 - Alcohol Permit

Drug store or physician to purchase alcohol for a patient on the prescription of a doctor.


Class 8 - Trade Show permits

A manufacturer donating liquor for a trade show made up of licensees of the board for the purpose of potential buyers.


Class 9 - Trade Show Permit/Donation for Delegates

A manufacturer donating liquor for a reception or meal at a trade show made up of licensees of the board.


Commercial Use Permit

Generally, a permit is required for any activity on state park land where a private business charges for their service. Examples are: Guided hikes, boat tours, bicycle races, day camps, charter bus stops, paddle board lessons, river rafting, rock climbing, photography instruction, or kayak adventures.


Filming and Photography Permit

Commercial filming, professional still photography, and educational filming and photography.


Punch Board / Pull-Tab Service Business Permit


Raffle Permit

For a nonprofit to raffle alcohol to its members.


Recreational Gaming Activity Permit (Commercial Business)


Recreational Gaming Activity Permit (Nonprofit)


Recreational Water Contact Facility Construction Permit

New Construction Modification Remodel Alteration


Recreational Water Contact Facility Operating Permit

Water contact facilities such as water slides.


Water Recreation Facility Construction Permit

Construction of new, remodel, alteration, and modification projects for water recreation facilities.

Top
Access Connection Permit

It is required to have a WSDOT approved permit prior to constructing an access connection to a state highway.


Auto Transportation and Bus Certificate


Building Move Permit

This permit allows a carrier a one time movement of a building a distance of less than 5 miles.


Canadian Weights for SR 9 Heavy Haul Corridor

This permit allows drivers to haul reducible loads with Canadian weights from the Canadian border to Sumas, Washington. Carriers applying for this permit must be licensed to their maximum in Washington State.


Canadian Weights US 97 Heavy Haul Corridor

This permit allows drivers to haul reducible loads with Canadian weights from the Canadian border to Oroville, Washington. Carriers applying for this permit must be licensed to their maximum in Washington State.


Cell Tower Permit - Type F Access - Wireless Communication Site Access Permit

It is required to have an approved permit prior to constructing an access connection to a state highway for the purpose of serving a wireless communication site.


Charter and Excursion Bus Certificate


Commercial Ferry Certificate


Common Carrier Permit


Double Trailer Monthly or Annual

Double trailer legal length is 61 feet. This permit allows up to 68 feet measured from front of the first trailer or load to the end of the last trailer or load whichever is longer. The load may be divisible or non-divisible.


Empty Apple Bins and Hay Bales Permit

The permit allows the hauling of empty apple bins up to 15 feet high. This permit can be used in conjunction with the double trailer permit. These permits are not exempt from restrictions. Oversize signs are required. Routes do not guarantee height clearance.


Farm Implement Permit

The permit allows a farmer or farm implement dealer to obtain a permit (per quarter or annual) for implements (any device that directly affects the production of agricultural products) over 16 feet to under 20 feet wide, less than 16 feet high, less than 65,000 pounds, and having a combined length not to exceed 70 feet. The permit requires a letter of approval by Commercial Vehicle Services from the farmer or implement dealer, which allows the permit to be issued for specific counties from any WSDOT permit office. For-hire carriers transporting farm implements do not qualify for this permit type. It is highly recommended that the referenced administrative code be reviewed due to the number of unique aspects to this permit type.


Freight Broker Certificate


Log Tolerance Permit

The purpose of the permit is to allow the combination to haul short logs and receive a variance from the legal weight chart. Is only valid for 3 axle trucks and 2 axle pole trailer combinations and is for hauling of unprocessed logs only.


Manufactured Housing Permit Monthly or Annual

Maximum dimensions allowed: 15 feet wide (14 foot box with 12 inch eaves); 15 feet high; and trailer length of 75 feet including tongue


Monthly Annual Fixed Load (3 or 4 axle)

This permit is an overweight permit for a vehicle with a weight that does not change, such as cranes, cement pumping trucks, and well drilling trucks. Fixed loads with 3 axles may be permitted up to 65,000 lbs. and fixed loads with 4 axles may be permitted up to 86,000 lbs. with the appropriate wheelbase and tire size. An axle spacing report is required to issue a fixed load permit.


Monthly or Annual Non-Divisible Permit

This permit allows a vehicle to haul a non-divisible load up to 14 feet wide, 15 feet high, and 125 feet in load length.


Oversize Overweight Load Permit

This permit is an overweight permit for a vehicle with an oversize and or overweight non-divisible load. To produce the Axle Spacing Report for Overweight Permits use: https://secure3.wsdot.wa.gov/commercialvehicle/permits/public/AxleSpacingReport.aspx, or call 360-704-6340 for assistance.


Oversize Overweight Super Load Permit

As the title implies, this is a overweight or oversized permit for superloads, loads that exceed 200,000 pounds, and/or exceed 16 feet in height or width, and/or 125 feet load length. In order to ensure safety to the public, the highways systems and carriers, these permits require application at least 30 days prior to the movement date for overweight superloads and at least 7 days prior for overheight superloads.


Railroad Contract Crew Carrier Permit


Sealed Container for SR 509 Heavy Haul Corridor

The special permit allows vehicles to operate in the heavy haul industrial corridor at the Port of Tacoma to carry weight in excess of weight established in RCW 46.44.041. However the excess weight on a single axle (22,000), tandem axle (43,000) or any axle group must not exceed that allowed by RCW 46.44.091 (1) and (2), weight per tire must not exceed 600 pounds per inch weight of tire, and gross vehicle weight must not exceed 105,500 pounds. The Heavy Haul Corridor extends on SR 509 between milepost .25 in the vicinity of East "D" Street and milepost 5.7 in the vicinity of Norpoint Way NE.


Single Trailer Permit Monthly or Annual

This permit allows for semi-trailer/divisible loads up to 56 ft. (3 ft. longer then the legal single semi-trailer/load length of 53 ft.), measured from front of trailer or load to the rear of the trailer or load whichever is longer.


Taxi (Vehicle for Hire)

Any individual or business that transports passengers for a fee must have a For Hire permit, including:

  • Taxicabs, which are motor vehicles that transport people for a fee and don’t have a fixed route or fixed starting and ending points.
  • Cabulances that transport riders who are confined to a wheelchair or otherwise physically restricted so they can’t be safely transported by public mass transportation, taxicabs, or automobiles…

Temporary Additional Tonnage

The permit is used to temporarily increase the licensed weight of a vehicle, but not more than legal capacity. Before purchasing temporary addition tonnage the vehicle must be licensed to at least 40,000 pounds for solo units and 80,000 pounds for combinations. A Temporary License Permit (Trip Permit) may be used to increase licensed weight to the required 40,000 or 80,000 pounds to qualify for the temporary Additional Tonnage Permit (additional tonnage may not be sold for periods greater than the period covered by the Trip Permits). Minimum permit duration 5 days.


Temporary Fuel Use Permit

If you don't pay fuel tax under the International Fuel Tax Agreement (IFTA) and need to travel in Washington and are driving a diesel or propane powered commercial vehicle with; 2 axles and a gross vehicle weight (GVW) over 26,000 lbs., 3 or more axles regardless of weight, or a combination of vehicles with a combined GVW over 26,000, you must purchase a Special Fuel Permit to allow operation of your vehicle in Washington.


Temporary License Permit

Temporary License Permits (also known as Trip Permits) allow vehicle owners to operate their unlicensed vehicles on public roadways. A vehicle is considered unlicensed if: the vehicle tabs are expired or the current gross weight isn't enough for the load being carried. These permits cannot be used in lieu of tonnage for a vehicle currently licensed in Washington but can be used to increase current tonnage. Permits are valid 3 consecutive days and no more than 3 permits can be issued for any 1 vehicle within a 30-day period.


Tow Truck Class B and C

The special permit issued specifically to tow trucks is an annual permit from the date of purchase. The permit is valid for emergent and non-emergent moves. Annual Tow Truck permits may be issued to Class B and Class C tow trucks, including Class E tow trucks with either a Class B or Class C rating. Class A or D tow trucks are not eligible for Annual Tow Truck permits.

Top
Biosolids Management (General Permit)

All public and private facilities within the jurisdiction of the State of Washington that meet the definition of Treatment Works Treating Domestic Sewage are subject to coverage under this permit for the following activities:
  • Treatment of sewage sludge or biosolids prior to beneficial use, disposal in a landfill, or incineration.
  • Application of non-exceptional quality biosolids to the land, including agricultural lands, forestlands, land reclamation sites, and public contact sites…

Certification of Inspectors of Solid Waste Incinerators and Landfill Facilities

Working for a public agency as a solid waste incinerator or landfill facility inspector.


Certification of Operators of Solid Waste Incinerators and Landfill Facilities

Working as the operator in charge of a solid waste incinerator or landfill facility.


Cleaning up a contaminated site under the model toxics control act (Contaminated Site Cleanup)

If a person decides to investigate or clean up a site, they must comply with the site testing and cleanup actions requirements in the MTCA Cleanup Regulation (WAC 173-340). No permit is required under MTCA to investigate or cleanup a site. However, people may need to obtain other state or local permits for these activities.


Dangerous Waste Treatment Storage and Disposal Facility - Permit Modification

Any modification or change to your existing Dangerous Waste Permit. Examples are:

  • A change in facility ownership.
  • Facility expansion or alteration.
  • A change in procedures, process or contact information…

Dangerous Waste Treatment Storage Disposal Facility - New Permit

The storing, treating and/or disposing of dangerous wastes in certain types of facilities. The permit does not apply to businesses that generate dangerous wastes and transport them off-site before certain "accumulation" time limits are exceeded. The permit also does not apply to permit-by-rule and treatment-by-generator activities when the generator complies with required standards.


Dangerous Waste Treatment Storage Disposal Facility - Permit Renewal

The storing, treating and/or disposing of dangerous wastes in certain types of facilities. These permits apply to a limited number of facilities that store, treat, and/or dispose of dangerous wastes. The permit does not apply to businesses that generate dangerous wastes and transport them off-site before certain "accumulation" time limits are exceeded. The permit also does not apply to permit-by-rule and treatment-by-generator activities when the generator complies with required standards. Any facility with a permit who wants to continue to operate after the permit expires must submit a new application 180 days before the expiration date of the effective permit. The application must be signed and certified by the owner and operator.


Reporting Requirement for a Spill or Release of a Hazardous Substance

Spilling or releasing oil or a hazardous substance.


Reporting Requirements for Contaminated Sites and Releases under MTCA

In general, all activities that release hazardous substances to the environment must comply with the MTCA reporting requirement. However, the MTCA Cleanup Regulation (Chapter 173-340 WAC) includes several exemptions from the notification requirement (See WAC 173-340-300(2). If a person decides to investigate or clean up a site, they must comply with the site testing and cleanup actions requirements in the MTCA Cleanup Regulation. No permit is required under MTCA to investigate or cleanup a site. However, people may need to obtain other state or local permits for these activities.


Resource Conservation and Recovery Act (RCRA) Site Identification Number (RCRA Site ID)

You need a RCRA Site ID Number if you generate, transport, transfer, recycle, treat, store, or dispose of regulated amounts of dangerous waste.


Solid Waste Handling Permit Exemption for Anaerobic Digesters

ADs that accept up to 30% (by volume) of off-farm pre-consumer food waste as digester feedstock (to be mixed with dairy manure) must apply for this permit exemption unless they are applying for the solid waste handling permit. ADs in compliance with the exempt conditions are limited in how they may use digestate solids and liquids. Use is allowed on the dairy as described in their updated nutrient management plan. The updated nutrient management plan must account for the added nutrients from the off-farm pre-consumer food waste. Solids may be transferred to a composting operation or other uses if compost testing standards are met. The exemption conditions are detailed in the law RCW 70.95.330 and WAC 173-350-250.


Underground Storage Tank Facility Compliance Tag/Permit

Owning and/or operating an underground storage tank (UST).


Underground Storage Tank Notification Requirements (UST Notification)

Installing or removing an underground storage tank. Certain tanks are exempt from the 30-Day Notice form; to verify whether your tank is exempt please check the 30-Day Notice form.


Voluntary Cleanup Program (VCP)

The VCP is voluntary and is not required to conduct independent cleanup actions for a contaminated site. People can apply to either the Standard VCP process or the Expedited VCP process. Both processes offer a free 1-hour technical consultation for people interested in applying to the VCP. These consultations may include: • Technical assistance. VCP may provide technical assistance to people before and during a remedial investigation or cleanup of a contaminated site, including assisting with identifying and applying regulatory requirements. •Informal opinions. VCP may provide informal, written opinions on whether a planned or completed site investigation or cleanup complies with applicable regulatory requirements. VCP may issue a no further action…


Waste Tire Carrier License

Hauling waste tires and/or owning or operating a waste tire storage site.


Waste Tire Storage Site Owner License

Owning or operating a waste tire storage site.

Top
Aquatic Mosquito Control Permit - NPDES General Permit

The application of mosquito larvicides or adulticides to state waters requires permit coverage, whether it is a direct or indirect discharge. For example, a direct discharge is the application of larvicides directly to surface water, while an indirect discharge is the settling of adulticides onto surface water even though the water was not the target area.

Government entities and Mosquito Control Districts may hold one permit coverage that covers their entire jurisdiction. Commercial applicators must get…

Aquatic Plant and Algae Management - NPDES General Permit

Activities that result in a discharge of aquatic-labeled herbicides, algaecides, biological water clarifiers, adjuvants, marker dyes, shading products, and phosphorus inactivation products into freshwater (lakes, streams, and rivers) or along shorelines, roadsides, dikes/levees, and ditch banks. To find out the specific activities that trigger this permit, see Special Condition S1 on page 2 of the current permit or page 17 of the fact sheet. You can download both documents from the Aquatic Plant and Algae Management Permit website under Current Permit Documents.


Boatyard General Permit - NPDES

This Statewide general permit applies to boatyards that discharge stormwater runoff from areas with industrial activity directly to the ground, to a surface waterbody, or to a storm sewer system that drains to a surface waterbody. This general permit also regulates process wastewater from pressure washing in boatyards.

A boatyard is a commercial business engaged in the construction, repair and maintenance of small vessels, 85 percent of which are 65 feet or less in…


Concentrated Animal Feeding Operation General Permit - Expired: See comments/notes

Operating a concentrated animal feeding operation that discharges or proposes to discharge to State or Federal Waters (surface or ground).


Construction Stormwater General Permit - NPDES

Ecology requires construction site operators to have Construction Stormwater General Permit coverage if they are engaged in clearing, grading, and excavating activities that disturb one or more acres and discharge stormwater to surface waters of the state.

The permit is also required if clearing, grading or excavating activities disturb an area smaller than 1 acre if it is part of a "larger common plan of development or sale" that will disturb 1 acre or more and discharge stormwater to surface waters of the state or a conveyance system that drains to…

Drinking Water Operating Permit

Operating a public water system that has 15 or more services or serves more than 25 people a day for more than 60 days a year.


Fresh Fruit Packing General Permit - NPDES

Every new or existing fresh fruit packing facility which receives, packs, stores and/or ships either hard or soft fruit and discharges wastewater, including non-contact cooling water, needs coverage under either this general permit or an individual permit. Facilities that only discharge domestic wastewater or process water to a delegated pretreatment Publicly Owned Treatment Works (POTW) do not need coverage under this general permit. Any fruit packing facility which is located on the Colville Reservation may apply for coverage for only non-surface water discharges under this general permit. Discharges to surface water on the Colville Reservation are under EPA jurisdiction. The general permit does not excuse the permittee from complying with any applicable Federal, State…


General Permit Coverage - NPDES

Ecology issues general permits for point source discharges of pollutants into surface waters that belong to a category of discharger for which Ecology has developed a general NPDES permit.


Individual Permit - NPDES

Any discharge of wastewater and/or stormwater into surface waters through a conveyance system for which Ecology has not developed a general permit requires an individual NPDES permit.


Industrial Stormwater General Permit Coverage

Facilities conducting industrial activities that discharge stormwater to surface waters of the State. This includes private entities, state and local government facilities, and new facilities and existing facilities


Irrigation System Aquatic Weed Control General Permit

Irrigation water suppliers whose system is capable of discharging to or intersecting with points of compliance are required to have coverage under this general permit. 

To find out the specific activities that trigger this permit, please see the Irrigation System Aquatic Weed Control General Permit Fact Sheet


Laboratory Accreditation (Lab Accreditation)

Labs must receive accreditation through Ecology before they submit environmental, wastewater, drinking water, air, or biosolids analytical data to Ecology, the Department of Health, or other entities requiring the use of an accredited lab. Environmental data includes data submitted for the purposes of compliance with National Pollutant Discharge Elimination System (NPDES) or state waste discharge permits.


Municipal Stormwater General Permit - NPDES

Generally this permit is required of all municipalities within U.S. Census Bureau-defined urban areas and for designated cities with a population over 10,000 located outside of urban areas. Urbanized areas are population centers with greater than 50,000 people and densities of at least 1,000 people per square mile, with surrounding areas having densities of at least 500 people per square mile. The urbanized areas in this permit are based on the 2000 population census. The Washington State Department of Transportation is also required to have coverage within permitted municipalities. Other public entities (such as ports, prison complexes, parks and drainage districts, and universities) that own or operate a storm sewer system and are located within a permitted…


On Site Sewage System, Large, Operating Permit (From 3,500 to 100,000 gallons per day)

An operating permit is needed for installation and operation of LOSS to treat residential-strength sewage through septic tanks or other treatment processes and dispersal through drainfields when there is a peak daily flow, at any common point, between 3,500 and 100,000 gallons per day.


On-Site Sewage Disposal Permit (More than 100,000 gallons per day)

Large On-site Sewage Systems with any of the following characteristics require coverage under this permit:

  • A design flow exceeding 100,000 gallons per day;
  • Systems whose discharge includes industrial/commercial process wastewater or stormwater;
  • Systems that discharge to the land surface (such as wetlands or infiltration lagoons without a drainfield); or…

On-Site Sewage System Permit (Less than 3,500 gallons per day)

A permit or approval is needed before the installation, repair, modification, connection to, or expansion of an on-site sewage system with a peak daily flow of less than 3,500 gallons of residential-strength sewage.


Reclaimed Water Permit

Reclaimed Water Permits regulate the production, distribution, and use of reclaimed water generated according to provisions of the State Reclaimed Water Use Act. Proposed generators of reclaimed water must obtain a Permit prior to the distribution and use of the water.


Sand & Gravel General Permit for Non-Portable Facilities - NPDES

Sand and gravel operations, rock quarries, and similar mining operations, as well as concrete batch plants and hot mix asphalt operations that have a discharge of process wastewater, stormwater, or mine dewatering water.


Sand & Gravel General Permit for Portable Facilities (NPDES)

Portable rock crushing operations, concrete batch plants, and asphalt batch plants that have a discharge of process wastewater, stormwater, or mine dewatering water. The Department of Ecology (Ecology) requires a permit whenever a portable facility:

  • Operates at a location that does not have permit coverage for the activity the portable will be performing.
  • Operates at a location that does not have active operating status…

State Wastewater Discharge Permit


State Wastewater Discharge Permit – Industrial to Ground Water


State Wastewater Discharge Permit – Industrial to Publicly-Owned Works (POTW)

Industrial facilities that discharge wastewater to privately or publicly-owned wastewater treatment plants must obtain a state waste discharge permit unless it has obtained a pretreatment discharge permit issued by a delegated municipality.


Underground Injection Control Well Registration

Applicants who have installed or are planning to install an Underground Injection Control (UIC) well are required to register and the well receive rule authorization before the well is used. New wells need to be registered before use. Existing UIC wells that have not been registered with Ecology need to register as well (if on Tribal land register with EPA Region 10).


Upland Fin-Fish Hatching and Rearing General Permit - NPDES


Vessel Deconstruction General Permit

Any deconstruction activities involving dismantling any portion of a vessel hull, topside, or superstructure while the vessel is over water, on a drydock, or on a barge.


Wastewater Treatment Plant Operator Certification

Wastewater operator certification is required for (1) the operator in responsible charge of a domestic wastewater treatment plant and (2) the lead operator of each shift at a domestic wastewater treatment plant.


Water System Construction and Operation Approval

Providing water through pipes or other conveyances to one or more commercial connections or two or more residential service connections where people have access to use the water.


Water Treatment Plants General Permit - NPDES Waste Discharge

All WTPs that discharge backwash effluent to surface water and that meet all of the following conditions must obtain coverage:

  • Produce potable water or "industrial" water (primary treatment/settled water) where the treatment and distribution of water is the primary function of the facility.


Waterworks Operator Certification

Operating a waterworks, or a portion of waterworks, including any treatment facilities or distribution systems.


Winery General Permit

Discharges of winery process wastewater to land, groundwaters, or to a wastewater treatment plant, with some exceptions, require coverage under this permit. The exceptions for permit coverage are stated in Special Condition S1 of the Winery General Permit.

Top
Aquifer Storage, Recovery, and Recharge Permit

A reservoir permit is required to fill impoundments that will store water to a depth of 10 or more feet, or impoundments that will retain 10 or more acre-feet of water. This definition applies to both off-channel and in-stream impoundments. Unless otherwise specified, a reservoir permit will allow the permittee to fill the reservoir once a year. The permit specifically states the period during which the reservoir can be filled.


Dam Construction Permit

A Dam Safety Construction Permit is required before constructing, modifying, or repairing any dam or controlling works for storage of 10 or more acre-feet of water, liquid waste, or mine tailings. This requirement may apply to dams and storage lagoons for: 
  • Flood control. 
  • Domestic or irrigation water. …

Managed Aquifer Recharge (MAR) Permit

Ecology requires a MAR permit when the applicant needs a new source of water to construct a MAR facility. If the applicant has existing water rights to source water or reclaimed water, they cannot use the MAR permitting process.


Notice of Intent to Construct or Decommission a Well

Drilling activities that include:

  • Deepening.
  • Alteration.
  • Reconstruction…

Surface Reservoir Permit

Ecology requires a reservoir permit to fill impoundments that will store water to a depth of 10 or more feet, or impoundments that will retain 10 or more acre-feet of water. This definition applies to both off-channel and in-stream impoundments.


Water Right Change of Transfer (Report of Examination for Water Right Change / Superseding Water Right Certificate)

A change to the place of use, adding or changing a point of diversion or withdrawal, or a change to the purpose of use of an existing water right.


Water Right, New

State law requires a water right permit before using any surface water (lakes, ponds, rivers, streams, or springs) for beneficial use as stated above. This applies to beneficial use that started after the state water code was enacted in 1917. State law also requires a water right permit before withdrawing groundwater for beneficial use. This applies to beneficial use that started in 1945 when the state groundwater code was enacted - unless the use is specifically exempt from state permitting requirements. Exemptions include:…


Well Construction and Operator's License

A drilling license is required for all drilling activities for all types of wells including:

  • Water wells.
  • Monitoring wells.
  • Geotech soil borings…
Top
Wetland Mitigation Bank Certification

Establishment and operation of a wetland mitigation bank. A wetland mitigation bank is a site where wetlands are restored, created, enhanced, or preserved.


Wetlands (Including Non-Federally Regulated Wetlands)

Working in or near wetlands, areas that are transitional between open water and uplands or that may be periodically inundated or saturated.